how to wire recessed lighting in a basement with a suspended ceiling Full Size of Ceiling:drop Ceiling Paint Ideas Ideas Collection Basement Recessed Lighting, Dropped 7 Brilliant How To Wire Recessed Lighting In A Basement With A Suspended Ceiling Ideas

7 Brilliant How To Wire Recessed Lighting In A Basement With A Suspended Ceiling Ideas

Related photos in this project:

Other recommended ideas:

Full Size Of Ceiling:Drop Ceiling Paint Ideas Ideas Collection Basement Recessed Lighting, Dropped - 6. Maximum fundamental tees are 12 ft lengthy and feature go tee slots punched every 12 inches, starting 6 inches from each quit. Measure this distance along the top flange of the principle tee and find the slot just beyond this point. From this slot, degree again the same distance, subtract 1/eight" and noticed the primary tee at that factor. The 1/8" subtraction is for the thickness of the wall angle. If the wall angles aren't square, function the move tee slots hence. Because the room is less than 12 toes across, reduce the principle tee to the exact dimension of the room, allowing 1/8" for the thickness of the wall angle. Determine the precise top at which the suspended ceiling may be set up. Allow no less than 3 to four inches for clearance among the old ceiling and the new ceiling. Keep in mind that additional clearance could be required if recessed lights is getting used.

2. Fasten the wall angles, or tracks, securely to the wall in any respect factors. Nail them firmly to studs, or use screw anchors or different masonry fasteners on brick or masonry partitions. Function the wall angle in order that the bottom flange rests on the level line you've got drawn at the wall. Overlap the wall attitude on inside corners, and miter the wall attitude on out of doors corners. Reduce any needed angles with steel reducing snips or a hacksaw. Set the wall perspective low sufficient to conceal as many pipes, ducts, and so on., As possible. Installation the primary tees in order that they are all degree with the wall perspective already hooked up. Use an extended stage for this. Install the cross tees by using inserting the ends of the cross tees into the slots inside the essential tees. Use the manufacturer's commands for fitting the pass tees into function. Determine the vicinity of the move tees by means of the pattern selected.

Talk over with the format sheet to determine the distance from the wall to the primary pass tee. Degree this distance along the top flange of the primary tee and locate the slot simply past this point. From this slot, degree again the equal distance, subtract 1/eight" and saw the main tee at that point. The 1/8" subtraction is for the thickness of the wall perspective. If the wall angles aren't square, position the go tee slots for this reason. While fundamental tees are set up in rooms less than 12 ft throughout, cut the main tee to the precise dimension of the room, permitting 1/eight" for the thickness of the wall angle. For rooms wider than 12 feet, the primary tee can be spliced. Be sure to align the splice so that the suspension wires are successfully positioned. Splice carefully, or all the primary tees can be thrown off.